Refer to Prefabricated Structures MCQ Questions and Answers in Civil Engineering provided below. Civil Engineering MCQ questions with answers are available for download in Pdf. The MCQ Questions for Civil Engineering with answers are aligned as per the latest syllabus and exam pattern suggested for your exams. Multiple Choice Questions for Prefabricated Structures are an important part of exams for Civil Engineering and if practiced properly can help you to improve your understanding of Prefabricated Structures and get higher marks. Refer to more Chapter-wise MCQs for Civil Engineering and also download more latest study material for all subjects
MCQ for Civil Engineering Prefabricated Structures
Civil Engineering students should refer to the following multiple-choice questions with answers for Prefabricated Structures
Prefabricated Structures MCQ Questions Civil Engineering with Answers
Question. Depending on the degree of workability and placing condition determine the
(a) slump value
(b) the maximum size of aggregate
(c) the amount of mixing water
(d) the minimum water-cement ratio
Answer : A
Question. Which is the system for prefabrication?
(a) closed pfs.
(b) open pfs
(c) floor pfs
(d) roof system
Answer : B
Question. Which are the characteristics of Materials used for construction of PFS?
(a) thermal insulation property
(b) combustibility
(c) heavier materials
(d) none of the above
Answer : A
Question. What demands for disuniting the prefabricated structures?
(a) less weight
(b) quality
(c) transportation and placing of structures
(d) design constraints
Answer : C
Question. At what point in the members disuniting should be done?
(a) at minimum shear points
(b) at corners or points of minimum moments
(c) at points of maximum moment
(d) at intersections
Answer : B
Question. During disuniting joints are provided at
(a) at corners or point of minimum bending moment joint
(b) at center of member
(c) at intersections
(d) at tension joints
Answer : A
Question. The elastic rebound theory is an explanationfor how ... is spread duringearthquakes
(a) load
(b) stress
(c) energy
(d) intensity of load
Answer : C
Question. Choose the correct answer in terms of special requirements for building in High Seismic Zones
(a) the height of the building shall generally restricted to 5 stores in zone iv
(b) the height of the building shall generally restricted to 7 stores in zone iv
(c) the height of the building shall generally restricted to 8 stores in zone iv
(d) the height of the building shall generally restricted to 10 stores in zone iv
Answer : D
Question. Which of the following does not comes under the types of progressive collapse
(a) domino-type collapse
(b) section type collapse
(c) stability type collapse
(d) mixed-type collapse
Answer : C
Question. Which of the following stress affects the Demoulding?
(a) stripping stress
(b) dynamic stress
(c) erection stress
(d) lifting stress
Answer : A
Question. What are the Advantages of standardization?
(a) easier for design
(b) easier to manufacture
(c) easier to erection and completion
(d) all of the above
Answer : D
Question. Slip form construction is a construction method in which concrete is poured into
(a) static firm
(b) continuously moving firm
(c) vertically moving firm
(d) interrupted firms
Answer : D
Question. If Joint deformation in the prefabricated structures is allowed It means
(a) allowance for joint flexibility
(b) allowance for stress
(c) allowance for swaying
(d) allowance for stress accumulation
Answer : A
Question. During design of elements in prefabricated structures due consideration should be given to
(a) quality materials
(b) stresses developed during handling the members
(c) minimum factor of safety
(d) all of these
Answer : D
Question. Damping is the energy dissipation properties of a material or system under stress.
(a) dynamic stress
(b) static stress
(c) non cyclic stress
(d) cyclic stress
Answer : D
Question. Choose the correct answer in terms of special requirements for building in High Seismic Zones
(a) the height of the building shall generally restricted to 5 stores in zone v
(b) the height of the building shall generally restricted to 6 stores in zone v
(c) the height of the building shall generally restricted to 7 stores in zone v
(d) the height of the building shall generally restricted to 8 stores in zone v
Answer : A
Question. Which of the following stress affects the Transportation?
(a) stripping stress
(b) dynamic stress
(c) erection stress
(d) lifting stress
Answer : B
Question. Which of the below equipment is not used for hoisting of prefabricated components?
(a) stationary cranes
(b) cranes on rails
(c) mobile cranes
(d) all of the above
Answer : D
Question. The large reinforced concrete roofing members in prefabricated structures are
(a) directly supported by main girders
(b) directly supported on panel members
(c) two way reinforcement is provided
(d) provided with less reinforcement
Answer : A
Question. In places where transportation of large members is difficult what kind of fabrication is preferred?
(a) plant prefabrication
(b) site fabrication
(c) standardisation
(d) prefabricate systems
Answer : B
Question. Which of the following defines Magnitude?
(a) the severity of earthquake shaking is assessed using a descriptive scale
(b) quantitative measure of the size of the earthquake at its source
(c) both a &b
(d) none of the above
Answer : B
Question. How may methods are available for Manufacture of precast concrete elements?
(a) one
(b) two
(c) three
(d) four
Answer : B
Question. Prefabrication is a ................... construction method
(a) automotive
(b) modern
(c) established
(d) industrialised
Answer : D
Question. Why should we give allowance for joint deformation?
(a) to take care of the joints
(b) to take care of the deformation due toir regularities
(c) to take care of the disuniting of member
(d) to take care of moments in the members
Answer : B
Question. Plant fabrication is suited better for
(a) large number of small prefabricates
(b) large e long panel members
(c) standard is members
(d) limited production
Answer : A
Question. In a Prefabricated R C floors in a cyclone prone zone the Structural deck concrete of grade not leaner than .............. should be provided over pre-cast components to act monolithic with them.
(a) m10
(b) m15
(c) m20
(d) m25
Answer : C
Question. Which one is not the characteristic of Materials used for construction of PFS?
(a) non durability
(b) non combustibility
(c) lighter materials
(d) none of the above
Answer : A
Question. Certain geometric discipline using practical approaches which relate to setup coordination and measurement of components and spaces in building design is introduced in
(a) standardization
(b) modular coordination
(c) remoulding
(d) moulding
Answer : B
Question. What is the disadvantages of disuniting of structures?
(a) easy to transport the members from casting yard to site.
(b) requires lesser capacity of lifting arrangements.
(c) identifying the joint location
(d) require less amount of supporting arrangements
Answer : C
Question. Transportation of precast members accounts for about
(a) 20-25%ofthecostof production and assembling
(b) 10-15% of the cost of production and assembling
(c) 10-20% of the cost of production and assembling
(d) 5-15% of the cost of production and assembling
Answer : B
Question. How many methods are generally used to avoid the disproportionate collapse in a building?
(a) oone
(b) two
(c) three
(d) zero
Answer : C
Question. What is the nature erection stresses?
(a) dynamic
(b) static
(c) compatible
(d) rigid
Answer : A
Question. What is disuniting of Structure?
(a) dividing into panels
(b) organizing the panels
(c) erecting the panels
(d) making into smaller members
Answer : D
Question. The economy of cross section is measured by
(a) shape factor
(b) form factor
(c) section modulus
(d) material
Answer : B
Question. Choose the correct answer.
(a) converting static load into dynamic load is known as equivalent design loads.
(b) converting dynamic load into static load is known as equivalent design loads.
(c) both a &b
(d) none of the above
Answer : B
Question. Which method is not adopted in precasting?
(a) tilting mould method
(b) long line method
(c) extrusion method
(d) static method
Answer : D
Question. Based on load transfer the joints can be classified as
(a) tension joint
(b) compression joint
(c) flexural joint
(d) all of these
Answer : D
Question. .................... is the factor used to obtain the design seismic force depending on the functional use of the structure, characterized by hazardous consequences of its failure, its post-earthquake functional need, historic value, or economic importance.
(a) importance factor
(b) response reduction factor
(c) all of the above
(d) none of the above
Answer : A
Question. In the production of prefabricated structures how does the material used in construction affect the element?
(a) material quality and economic design
(b) smaller members
(c) disuninting of members
(d) joints
Answer : A
Civil Engineering Prefabricated Structures MCQs
We hope students liked the above MCQs for Prefabricated Structures designed as per the latest syllabus for Civil Engineering. Students should download the Multiple Choice Questions and Answers in Pdf format and practice the questions and solutions given above Civil Engineering MCQs Questions on daily basis. All latest MCQs with answers have been developed for Civil Engineering by referring to the most important and regularly asked topics which the students should learn and practice to get better score in tests and examinations.
MCQs for Civil Engineering Prefabricated Structures
Expert teachers of studiestoday have referred to latest book for Civil Engineering to develop the Civil Engineering MCQs. If you download MCQs with answers for the above chapter daily, you will get higher and better marks in test and exams in the current year. Daily Multiple Choice Questions practice of Civil Engineering and its study material will help students to have stronger understanding of all concepts.
Prefabricated Structures MCQs Civil Engineering
All MCQs given above for Civil Engineering have been made as per the latest syllabus and books issued for the current academic year. The students can refer to the answers which have been also provided by our teachers for all MCQs of Civil Engineering so that you are able to solve the questions and then compare your answers with the solutions provided by us. We have also provided lot of MCQ questions for Civil Engineering so that you can solve questions relating to all topics given in each chapter. All study material for Civil Engineering students have been given on studiestoday.
Civil Engineering MCQs for Prefabricated Structures
Regular MCQs practice helps to gain more practice in solving questions to obtain a more comprehensive understanding of Prefabricated Structures concepts. MCQs play an important role in developing understanding of Prefabricated Structures. Students can download and save or print all the MCQs, printable assignments, practice sheets of the above chapter in Civil Engineering in Pdf format from studiestoday. After solving these you should also refer to Civil Engineering MCQ Test for the same chapter
MCQs Civil Engineering Prefabricated Structures
Civil Engineering best textbooks have been used for writing the problems given in the above MCQs. If you have tests coming up then you should revise all concepts relating to Prefabricated Structures and then take out print of the above MCQs and attempt all problems. We have also provided a lot of other MCQs for Civil Engineering which you can use to further make yourself better in Civil Engineering
You can download the MCQs for Civil Engineering Prefabricated Structures for latest session from StudiesToday.com
Yes, the MCQs issued for Civil Engineering Prefabricated Structures have been made available here for latest academic session
Learning Prefabricated Structures based MCQs will help students improve their overall understanding of important concepts and topics and help to score well in Civil Engineering exams.
You can practice Prefabricated Structures through worksheets, textbooks and online quizzes provided by studiestoday.com.
You can find Civil Engineering Prefabricated Structures MCQs on educational websites like studiestoday.com, online tutoring platforms, and in sample question papers provided on this website.
To prepare for Prefabricated Structures MCQs, refer to the concepts links provided by our teachers and download sample papers for free.
Yes, there are many online resources that we have provided on studiestoday.com available such as practice worksheets, question papers, and online tests for learning MCQs for Civil Engineering Prefabricated Structures
Yes, you can find printable Prefabricated Structures worksheets for Civil Engineering on studiestoday.com.
We have provided full database of free multiple choice questions with answers on studiestoday.com for Civil Engineering Prefabricated Structures