Estimation Costing and Valuation Engineering MCQ Questions and Answers in Civil Engineering

Refer to Estimation Costing and Valuation Engineering MCQ Questions and Answers in Civil Engineering provided below. Civil Engineering MCQ questions with answers are available for download in Pdf. The MCQ Questions for Civil Engineering with answers are aligned as per the latest syllabus and exam pattern suggested for your exams. Multiple Choice Questions for Estimation Costing and Valuation Engineering are an important part of exams for Civil Engineering and if practiced properly can help you to improve your understanding of Estimation Costing and Valuation Engineering and get higher marks. Refer to more Chapter-wise MCQs for Civil Engineering and also download more latest study material for all subjects

MCQ for Civil Engineering Estimation Costing and Valuation Engineering

Civil Engineering students should refer to the following multiple-choice questions with answers for Estimation Costing and Valuation Engineering

Estimation Costing and Valuation Engineering MCQ Questions Civil Engineering with Answers

Question. A structure that carries water above land is known as an
(a) aqueduct
(b) aquedant
(c) over surface
(d) outland

Answer : A

Question. culverts have a concrete (sometimes other materials can be used too) floor allowing the water to flow smoothly through it.
(a) box
(b) cylindrical
(c) narrow
(d) long

Answer : A

Question. An is an oldest type of machine which removes earth.
(a) escalator
(b) excavator
(c) elevator
(d) bulldozer

Answer : B

Question. Which of the following is not a classification of labour?
(a) skilled first class
(b) skilled second class
(c) unskilled
(d) unskilled fourth class

Answer : D

Question. The unit of payment of cement concrete in lintels is
(a) per sqm
(b) per cum
(c) quintal
(d) kilograms

Answer : B

Question. Which technique is applicable when other projects in the same analogy application domain have been completed?
(a) algorithmic cost modelling
(b) expert judgement
(c) estimation by analogy
(d) parkinson’s law

Answer : C

Question. For third class building flooring shall be of brick-on-edge floor over well rammed earth.
(a) true
(b) false

Answer : A

Question. The roofing cannot be made with slate.
(a) true
(b) false

Answer : B

Question. Approximate cost of sewerage project for a population of one Rs. 10/- head works out as Rs. 10 lakh.
(a) true
(b) false

Answer : B

Question. The term is used to denote a procedure of costing or valuing an item of work on the basis of actual labourers and materials required
(a) prime cost
(b) hour-work
(c) day-work
(d) sub-work

Answer : C

Question. involves the preparation of tenders based on a typical or notional bill of quantities or schedule of works.
(a) framework tendering
(b) selective tendering
(c) negotiated tendering
(d) serial tendering

Answer : D

Question. Mutual mistake occurs when both parties of a contract are mistaken as to the terms.
(a) false
(b) true

Answer : B

Question. Approximate cost of a hostel building for 100 students @Rs.10000/- per student works out as Rs. 10 lakhs.
(a) true
(b) false

Answer : A

Question. What is the full form of ITA-2000?
(a) information tech act -2000
(b) indian technology act -2000
(c) international technology act -2000
(d) information technology act -2000

Answer : D

Question. Extracting data items and objects, to get information on data flow, and to understand the existing data structures that have been implemented is sometimes called
(a) data analysis
(b) directionality
(c) data extraction
(d) client applications

Answer : A

Question. Which of the following pavement has greater life?
(a) bituminous pavements
(b) cement concrete pavements
(c) gravel roads
(d) earth roads

Answer : B

Question. The maximum stress sustained by concrete pavements in kg/cm2 is
(a) 40
(b) 45
(c) 50
(d) 55

Answer : B

Question. 3 SEPTIC TANK
(a) 12
(b) 10
(c) 8
(d) 15

Answer : D

Question. The shape of the tank is circular.
(a) true
(b) false

Answer : B

Question. Which of the following methods are not used for the dispersion of the effluent out of a septic tank?
(a) wetlands
(b) soak pit
(c) evapo-transpiration mound
(d) leach field

Answer : A

Question. Which of the following reasons is correct with respect to the need of providing baffle walls?
(a) mixing of scum and wastewater
(b) settling of heavy particles
(c) increase velocity of the liquid
(d) prevent scum and solids from escaping

Answer : D

Question. Septic tank is usually consists of brick wall in cement not less than
(a) 20 cm
(b) 100 cm
(c) 80 cm
(d) 200 cm

Answer : A

Question. As of 2013 pit latrines are used by an estimated people.
(a) 1.77 billion
(b) 2.77 million
(c) 1.77 billion
(d) 4.66 billion

Answer : C

Question. The material retained or supported by the retaining structure is called
(a) surcharge
(b) support wall
(c) back fill
(d) all of the mentioned

Answer : C

Question. The plastic state of stress was proposed by
(a) mohr
(b) rankine
(c) coulomb
(d) darcy

Answer : B

Question. Before applying water proof mud plaster, the joints should not be scrapped
(a) true
(b) false

Answer : B

Question. Which of these is usually written in a form of a memorandum?
(a) informal reports
(b) formal reports
(c) professional reports
(d) business reports

Answer : A

Question. report provides rational findings.
(a) informative
(b) interpretative
(c) routine
(d) progress

Answer : B

Question. Which of these reports involves the checking of a piece of equipment to see if it’s still in working condition?
(a) progress report
(b) laboratory report
(c) inspection report
(d) inventory report

Answer : C

Question. Which of the following is not a type of cyber crime?
(a) data theft
(b) forgery
(c) damage to data and systems
(d) installing antivirus for protection

Answer : D

Question. Under which section of IT Act, stealing any digital asset or information is written a cyber-crime.
(a) 65
(b) 65-d
(c) 67
(d) 70

Answer : A

Question. Which of the following is not an example of a computer as weapon cyber-crime?
(a) credit card fraudulent
(b) spying someone using keylogger
(c) ipr violation
(d) pornography

Answer : B

Question. Quotations are letters of enquiry.
(a) true
(b) false

Answer : A

Question. A tender is advertised in
(a) newspapers
(b) business environment
(c) domestic markets
(d) sellers

Answer : A

Question. The core of reverse engineering is an activity called
(a) restructure code
(b) directionality
(c) extract abstractions
(d) interactivity

Answer : C

Question. Which of the following is not an objective of reverse engineering?
(a) to reduce maintenance effort
(b) to cope with complexity
(c) to avoid side effects
(d) to assist migration to a case environment

Answer : D

Question. Which tender allows anyone to submit a tender to supply the goods or services that are required?
(a) framework tendering
(b) selective tendering
(c) open tendering
(d) close tendering

Answer : C

Question. A culvert can be used to span over a canyon, or depression, or even over a freeway or roadway.
(a) true
(b) false

Answer : B

Question. A can be used on wet ground and in all conditions of weather.
(a) grader
(b) scraper
(c) escalator
(d) bulldozer

Answer : D

Question. type of scraper consists of a four wheeled scrapper bowl towed behind crawler Power unit.
(a) three axle
(b) two axle
(c) crawler drawn
(d) four axle

Answer : C

Question. type of excavator carries the skimmer at its lower end
(a) skimmer
(b) dredger
(c) escalator
(d) elevator

Answer : A

Question. Which of the following are parameters involved in computing the total cost of a software development project?
(a) hardware and software costs
(b) effort costs
(c) travel and training costs
(d) all of the mentioned

Answer : D

Question. Which of the following states that work expands to fill the time available.
(a) case tools
(b) pricing to win
(c) parkinson’s law
(d) expert judgement

Answer : C

Question. Specification does not specify or describes the nature and the class off the work, materials to be used in the work, workmanship, etc
(a) false
(b) true

Answer : A

Question. For fourth class building the doors and windows shall be of wood or country woo(d)
(a) sal
(b) neem
(c) teak
(d) mango

Answer : D

Question. is required for preliminary studies of various aspects of a work or project.
(a) supplementary estimate
(b) plinth area estimate
(c) revised estimate
(d) abstract estimate

Answer : D

Question. estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.
(a) supplementary and revised estimate
(b) maintenance estimate
(c) item rate estimate
(d) revised estimate

Answer : B

Question. An invitation to tender might not include?
(a) holiday packages
(b) preliminarie
(c) a letter of invitation to tender
(d) design drawing

Answer : A

Question. Scrap value is the net annual letting value of a property, which is obtained after deducting the amount of yearly repairs from the gross income.
(a) true
(b) false

Answer : B

Question. Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools?
(a) an application-composition model
(b) a post-architecture model
(c) a reuse model
(d) an early design model

Answer : C

Question. The soil becomes weak in
(a) summer
(b) winter
(c) rainy season
(d) spring season

Answer : C

Question. The ICPB may be used in
(a) water logged areas
(b) parks
(c) footpaths
(d) highways

Answer : A

Question. Septic tank is a small scale treatment unit.
(a) true
(b) false

Answer : A

Question. What are the product gases of anaerobic digestion?
(a) carbon-dioxide and methane
(b) methane and oxygen
(c) oxygen and carbon-dioxide
(d) nitrogen and methane

Answer : A

Question. The size of the faeces drop hole in the floor or slab should not be larger than
(a) 5m
(b) 25 cm
(c) 45 cm
(d) 250 mm

Answer : B

Question. The coefficient of earth pressure when the soil is at equilibrium is
(a) σv /σh
(b) σh /σv
(c) σv × σh
(d) σ1 / σ3

Answer : B

Question. The position of the backfill lying above the horizontal plane at the top of wall is called
(a) active state
(b) plasticity
(c) surcharge
(d) slip lines

Answer : C

Question. Which of these is not a formal report?
(a) informational
(b) informal
(c) interpretative
(d) routine

Answer : B

Question. Which of these is not mentioned in a progress report?
(a) name of project
(b) right choice of instruments
(c) nature of work
(d) amount of work left

Answer : B

Question. An culvert is normally a low profile culvert. It allows them to be installed without disturbing the causeway as it will span over the entire drainage width.
(a) box
(b) rectangle
(c) arch
(d) circular

Answer : C

Question. What is the name of the IT law that India is having in the Indian legislature?
(a) india’s technology (it) act, 2000
(b) india’s digital information technology (dit) act, 2000
(c) india’s information technology (it) act, 2000
(d) the technology act, 2008

Answer : C

Question. What type of cyber-crime, its laws and punishments does section 66 of the Indian IT Act holds?
(a) cracking or illegally hack into any system
(b) putting antivirus into the victim
(c) stealing data
(d) stealing hardware components

Answer : A

Question. 7 DRAFTING MODEL TENDERS , E-TENDERING- DIGITAL SIGNATURE CERTIFICATES- ENCRYPTING - DECRYPTING
(a) date
(b) notice number
(c) sign
(d) designation

Answer : C

Question. Which of the following steps may not be used to define the existing data model as a precursor to re-engineering a new database model:
(a) build an initial object model
(b) determine candidate keys
(c) refine the tentative classes
(d) discover user interfaces

Answer : D

Question. How are final contracts signed in modern business?
(a) e-signatures
(b) document scanning
(c) thump impression
(d) shaking hands

Answer : A

Question. Box culverts can be defined as a passage for water over a natural ground having a deck
(a) outlighting
(b) culverting
(c) daylighting
(d) inlighting

Answer : C

Question. consists of a large bucket which is attached to a tractor.
(a) bulldozer
(b) scraper
(c) grader
(d) escalator

Answer : B

Question. type of excavator is used for digging at or below the operating level.
(a) skimmer
(b) dragline
(c) power shovel
(d) dredger

Answer : B

Question. Which of the following costs is not part of the total effort cost?
(a) costs of networking and communications
(b) costs of providing heating and lighting office space
(c) costs of lunch time food
(d) costs of support staff

Answer : C

Question. For First class building drawing room and dining room floors shall be of
(a) concrete
(b) tiles
(c) mosaic
(d) wooden

Answer : C

Question. The water proof mud- plaster consists of
(a) soil
(b) janta emulsion
(c) cowdung
(d) soil, janta emulsion and cowdung

Answer : D

Question. is the amount provided in the estimate and bill of quantities for some specialised work to be done by a specialised firm; whose details are not known at the time of preparing estimate.
(a) prime cost
(b) provisional sum
(c) capital cost
(d) building cost index

Answer : B

Question. A pumping set with a motor has been installed in a building at a cost of Rs.2500.00. Assuming the life of the pump as 15 years, work out the amount of annual instalment of sinking fund required to be deposited to accumulate the whole amount of 4% compound interest.
(a) rs.355
(b) rs.125
(c) rs.185
(d) rs.1950

Answer : B

Question. In reverse engineering process, what refers to the sophistication of the design information that can be extracted from the source code?
(a) interactivity
(b) completeness
(c) abstraction level
(d) direction level

Answer : C

Question. In India the flexible pavement is designed as per
(a) msa
(b) ksa
(c) csa
(d) fsa

Answer : A

Civil Engineering MCQ Questions and Answers
Advanced Construction and Equipments MCQ Questions and Answers in Civil Engineering
Airport Engineering MCQ Questions and Answers in Civil Engineering
Applied Mechanics and Graphic Statics MCQ Questions and Answers in Civil Engineering
Basics of Civil Engineering MCQ Questions and Answers in Civil Engineering
Building Construction MCQ Questions and Answers in Civil Engineering
Building Maintenance MCQ Questions and Answers in Civil Engineering
Building Materials MCQ Questions and Answers in Civil Engineering
Building Services MCQ Questions and Answers in Civil Engineering
Building Technology and Architectural Planning MCQ Questions and Answers in Civil Engineering
Concrete Technology and Design of Concrete Structures MCQ Questions and Answers in Civil Engineering
Concrete Technology MCQ Questions and Answers in Civil Engineering
Construction Management MCQ Questions and Answers in Civil Engineering
Construction Technology MCQ Questions and Answers in Civil Engineering
Design of Masonry Structures MCQ Questions and Answers in Civil Engineering
Docks and Harbor Engineering MCQ Questions and Answers in Civil Engineering
Elements of Remote Sensing MCQ Questions and Answers in Civil Engineering
Engineering Economics MCQ Questions and Answers in Civil Engineering
Engineering Geology MCQ Questions and Answers in Civil Engineering
Engineering Graphics MCQ Questions and Answers in Civil Engineering
Engineering Mechanics MCQ Questions and Answers in Civil Engineering
Environmental Engineering MCQ Questions and Answers in Civil Engineering
Estimating and Costing MCQ Questions and Answers in Civil Engineering
Estimation Costing and Valuation Engineering MCQ Questions and Answers in Civil Engineering
Geotechnical Engineering MCQ Questions and Answers in Civil Engineering
Highway Engineering MCQ Questions and Answers in Civil Engineering
Hydraulic Machines MCQ Questions and Answers in Civil Engineering
Hydraulics and Fluid Mechanics MCQ Questions and Answers in Civil Engineering
Irrigation Engineering MCQ Questions and Answers in Civil Engineering
Maintenance and Rehabilitation of Structures MCQ Questions and Answers in Civil Engineering
Prefabricated Structures MCQ Questions and Answers in Civil Engineering
Principles of Management MCQ Questions and Answers in Civil Engineering
Problem Solving and Python Programming MCQ Questions and Answers in Civil Engineering
Professional Ethics in Engineering MCQ Questions and Answers in Civil Engineering
Public Health Engineering MCQ Questions and Answers in Civil Engineering
Railway Bridge and Tunnel Engineering MCQ Questions and Answers in Civil Engineering
Railway Engineering MCQ Questions and Answers in Civil Engineering
RCC Structures Design MCQ Questions and Answers in Civil Engineering
Reinforced Cement Concrete Structures MCQ Questions and Answers in Civil Engineering
Societal and Global Impact MCQ Questions and Answers in Civil Engineering
Soil Mechanics and Foundations MCQ Questions and Answers in Civil Engineering
Steel Structures Design MCQ Questions and Answers in Civil Engineering
Strength of Materials MCQ Questions and Answers in Civil Engineering
Structural Analysis MCQ Questions and Answers in Civil Engineering
Structural Design and Drawing MCQ Questions and Answers in Civil Engineering
Structural Mechanics MCQ Questions and Answers in Civil Engineering
Surveying MCQ Questions and Answers in Civil Engineering
Theory of Structures MCQ Questions and Answers in Civil Engineering
Tunnel Engineering MCQ Questions and Answers in Civil Engineering
Waste Water Engineering MCQ Questions and Answers in Civil Engineering
Waste Water Treatment MCQ Questions and Answers in Civil Engineering
Water Supply Engineering MCQ Questions and Answers in Civil Engineering

Civil Engineering Estimation Costing and Valuation Engineering MCQs

We hope students liked the above MCQs for Estimation Costing and Valuation Engineering designed as per the latest syllabus for Civil Engineering. Students should download the Multiple Choice Questions and Answers in Pdf format and practice the questions and solutions given above Civil Engineering MCQs Questions on daily basis. All latest MCQs with answers have been developed for Civil Engineering by referring to the most important and regularly asked topics which the students should learn and practice to get better score in tests and examinations.

MCQs for Civil Engineering Estimation Costing and Valuation Engineering

Expert teachers of studiestoday have referred to latest book for Civil Engineering to develop the Civil Engineering MCQs. If you download MCQs with answers for the above chapter daily, you will get higher and better marks in test and exams in the current year. Daily Multiple Choice Questions practice of Civil Engineering and its study material will help students to have stronger understanding of all concepts.

Estimation Costing and Valuation Engineering MCQs Civil Engineering

All MCQs given above for Civil Engineering have been made as per the latest syllabus and books issued for the current academic year. The students can refer to the answers which have been also provided by our teachers for all MCQs of Civil Engineering so that you are able to solve the questions and then compare your answers with the solutions provided by us. We have also provided lot of MCQ questions for Civil Engineering so that you can solve questions relating to all topics given in each chapter. All study material for Civil Engineering students have been given on studiestoday.

Civil Engineering MCQs for Estimation Costing and Valuation Engineering

Regular MCQs practice helps to gain more practice in solving questions to obtain a more comprehensive understanding of Estimation Costing and Valuation Engineering concepts. MCQs play an important role in developing understanding of Estimation Costing and Valuation Engineering. Students can download and save or print all the MCQs, printable assignments, practice sheets of the above chapter in Civil Engineering in Pdf format from studiestoday. After solving these you should also refer to Civil Engineering MCQ Test for the same chapter

MCQs Civil Engineering Estimation Costing and Valuation Engineering

Civil Engineering best textbooks have been used for writing the problems given in the above MCQs. If you have tests coming up then you should revise all concepts relating to Estimation Costing and Valuation Engineering and then take out print of the above MCQs and attempt all problems. We have also provided a lot of other MCQs for Civil Engineering which you can use to further make yourself better in Civil Engineering

Where can I download latest MCQs for Civil Engineering Estimation Costing and Valuation Engineering

You can download the MCQs for Civil Engineering Estimation Costing and Valuation Engineering for latest session from StudiesToday.com

Are the Civil Engineering Estimation Costing and Valuation Engineering MCQs available for the latest session

Yes, the MCQs issued for Civil Engineering Estimation Costing and Valuation Engineering have been made available here for latest academic session

Why are Estimation Costing and Valuation Engineering important for students?

Learning Estimation Costing and Valuation Engineering based MCQs will help students improve their overall understanding of important concepts and topics and help to score well in Civil Engineering exams.

How can I practice Estimation Costing and Valuation Engineering Questions?

You can practice Estimation Costing and Valuation Engineering through worksheets, textbooks and online quizzes provided by studiestoday.com.

Where can I find Civil Engineering Estimation Costing and Valuation Engineering MCQs online?

You can find Civil Engineering Estimation Costing and Valuation Engineering MCQs on educational websites like studiestoday.com, online tutoring platforms, and in sample question papers provided on this website.

How can I prepare for Estimation Costing and Valuation Engineering MCQs?

To prepare for Estimation Costing and Valuation Engineering MCQs, refer to the concepts links provided by our teachers and download sample papers for free.

Are there any online resources for Civil Engineering Estimation Costing and Valuation Engineering?

Yes, there are many online resources that we have provided on studiestoday.com available such as practice worksheets, question papers, and online tests for learning MCQs for Civil Engineering Estimation Costing and Valuation Engineering

Can I find Civil Engineering Estimation Costing and Valuation Engineering practice worksheets online?

Yes, you can find printable Estimation Costing and Valuation Engineering worksheets for Civil Engineering on studiestoday.com.

How can I get more free MCQs with answers for Civil Engineering Estimation Costing and Valuation Engineering MCQs?

We have provided full database of free multiple choice questions with answers on studiestoday.com for Civil Engineering Estimation Costing and Valuation Engineering