Estimating and Costing MCQ Questions and Answers in Civil Engineering

Refer to Estimating and Costing MCQ Questions and Answers in Civil Engineering provided below. Civil Engineering MCQ questions with answers are available for download in Pdf. The MCQ Questions for Civil Engineering with answers are aligned as per the latest syllabus and exam pattern suggested for your exams. Multiple Choice Questions for Estimating and Costing are an important part of exams for Civil Engineering and if practiced properly can help you to improve your understanding of Estimating and Costing and get higher marks. Refer to more Chapter-wise MCQs for Civil Engineering and also download more latest study material for all subjects

MCQ for Civil Engineering Estimating and Costing

Civil Engineering students should refer to the following multiple-choice questions with answers for Estimating and Costing

Estimating and Costing MCQ Questions Civil Engineering with Answers

Question. The area is measured correct to the nearest
(a) 0.01 sqm
(b) 0.02 sqm
(c) 0.03 sqm
(d) 0.04 sqm

Answer : A

Question. Size, capacity and materials need be specified for
(a) Bib-cocks
(b) Stop-cocks
(c) Ball valves
(d) All the above

Answer : D

Question. The measurement is made in square metre in case of
(a) Cement concrete in foundation
(b) R.C.C. structure
(c) Hollow concrete block wall
(d) None of these

Answer : D

Question. Pick up the correct statement from the following:
(a) If the bed level is above N.S.L. the canal is called fully in baking and the berms are designed as 3d where d is full supply depth of water (F.S.D.
(b) Area of canal in cutting = BD + Sd2 where B = bed width, d = depth of cutting and S is the side slope
(c) Area of the bank of canal = B1d1 + Sd2 where B1, d1 and S are the width of bank, height of the bank above N.S.L. and side slope respectively
(d) If F.S.L. is above N.S.L. the canal is called partly in cutting and partly in filling and berms are designed as 2d where d is full supply depth
(E)  All the above

Answer : E

Question. Pick up the incorrect statement from the following:
(a) No deduction is made for the volume occupied by reinforcement
(b) No deduction is made for the openings upto 0.1 sq.m
(c) No deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in cross-section
(d) None of these

Answer : D

Question. Pick up the item of work not included in the plinth area estimate
(a) Wall thickness
(b) Room area
(c) W' Area
(d) Courtyard area

Answer : D

Question. For 100 sq. m cement concrete (1 : 2 : 4) 4 cm thick floor, the quantity of cement required, is
(a) 0.90 m3
(b) 0.94 m3
(c) 0.98 m3
(d) 1.00 m3

Answer : B

Question. The weight of an item is measured correct to nearest
(a) 0.25 kg
(b) 0.50 kg
(c) 0.75 kg
(d) 1.00 kg

Answer : D

Question. The expected out turn of half brick partition wall per mason per day is
(a) 1.5 m2
(b) 2.0 m2
(c) 4.0 m2
(d) 5.0 m2

Answer : D

Question. Pick up the incorrect statement regarding a master trap from the following:
(a) It is provided in between the lower end of the house drain and the street sewer
(b) It is provided a cleaning eye at the top of the trap
(c) The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
(d) The water seal is less than that of ordinary traps

Answer : D

Question. The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2 : 1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is
(a) 3250 m3
(b) 3225 m3
(c) 3275 m3
(d) 3300 m3

Answer : B

Question. While estimating the qualities for the construction of a building, the correct metric unit is
(a) Meter for length
(b) Cubic metre for area
(c) Square meters for volume
(d) Liter for capacity

Answer : D

Question. If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
(a) B + d + Sd
(b) Bd + Sd2
(c) B × d − Sd12
(d) 1/2 (Bd + Sd2)

Answer : B

Question. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
(a) Breadth of the wall
(b) Half breadth of wall on each side
(c) One fourth breadth of wall on each side
(d) None of these

Answer : B

Question. Pick up the incorrect statement from the following:
(a) Dimensions are measured to the nearest 0.01 m
(b) Areas are measured to the nearest 0.01 sq.m
(c) Cubic contents are measured to the nearest 0.1 cum
(d) Weights are measured to the nearest 0.001 tonnes

Answer : C

Question. The unit of measurement is per quintal for the following:
(a) Collapsible gates with rails
(b) Rolling shutters
(c) Expanded metal wire netting
(d) M.S. reinforcement of R.C.C. works

Answer : D

Question. The plinth area of a building not includes
(a) Area of the walls at the floor level
(b) Internal shaft for sanitary installations up to 2 sq m. in area
(c) Lift and wall including landing
(d) Area of cantilevered porch

Answer : D

Question. According to ISI method of measurement, the order of the sequence is
(a) Length, breadth, height
(b) Breadth, length, height
(c) Height, length, breadth
(d) None of these

Answer : A

Question. The damp proof course D.P.C. is measured in
(a) Cub. m
(b) Sq. m
(c) Meters
(d) None of these

Answer : B

Question. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
(a) 2.0 %
(b) 2.5 %
(c) 4.0 %
(d) 5.0 %

Answer : D

Question. Anti-siphonage pipe is connected to
(a) Main soil pipe
(b) Bottom of P trap W.C.
(c) Top of P trap W.C.
(d) Side of water closet

Answer : C

Question. Pick up the incorrect statement from the following:
(a) Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil
(b) The lead is calculated for each block of the excavated area
(c) The unit of lead is 50 m for a distance upto 500 m
(d) The unit of lead is 1 km where the lead exceeds 2 km

Answer : D

Question. If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is
(a) 30 D
(b) 39 D
(c) 50 D
(d) 59 D

Answer : D

Question. The volume is measured correct to the nearest
(a) 0.01 cum
(b) 0.02 cum
(c) 0.03 cum
(d) 0.04 cum

Answer : A

Question. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
(a) Mid-section formula
(b) Trapezoidal formula
(c) Prismoidal formula
(d) All the above

Answer : D

Question. The inspection pit or chamber is a manhole provided in a base drainage system
(a) At every change of direction
(b) At every change of gradient
(c) At every 30 m intervals
(d) All the above

Answer : D

Question. For the construction of buildings, the subheads of the estimate are
(a) Earthwork, Concrete work, Brick work
(b) Brickwork, Stone work, Roofing
(c) Brickwork Flooring, Wood work, Steel work
(d) All the above

Answer : D

Question. The expected out turn of 2.5 cm cement concrete floor per mansion per day
(a) 2.5 sqm
(b) 5.0 sqm
(c) 7.5 sqm
(d) 10 sqm

Answer : C

Question. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
(a) 1.5 m3
(b) 2.5 m3
(c) 3.5 m3
(d) 5.0 m3

Answer : D

Question. The brick work is measured in sq metre, in case of
(a) Honey comb brick work
(b) Brick flat soling
(c) Half brick walls or the partition
(d) All the above

Answer : D

Question. Pick up the correct statement from the following:
(a) All pipes and fittings are classified according to their diameters
(b) The diameter of the pipes is the nominal diameter of internal bore
(c) All pipes are measured along the centre line of the pipes in meters
(d) All the above

Answer : D

Question. The main factor to be considered while preparing a detailed estimate, is
(a) Quantity of the materials
(b) Availability of materials
(c) Transportation of materials
(d) All the above

Answer : A

Question. For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
(a) 0.200 m3
(b) 0.247 m3
(c) 0.274 m3
(d) 0.295 m3

Answer : C

Question. The detention period in a septic tank is assumed
(a) 20 minutes
(b) 25 minutes
(c) 30 minutes
(d) 40 minutes

Answer : C

Question. The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
(a) Excavation
(b) Surface dressing
(c) Cutting
(d) Surface excavation

Answer : D

Question. The expected out turn for earth work in excavation in ordinary soil per workman per day is
(a) 1.00 cum
(b) 2.00 cum
(c) 3.00 cum
(d) 4.00 cum

Answer : C

Question. The expected out turn of 12 mm plastering with cement mortar is
(a) 2.5 sq m
(b) 4.0 sq m
(c) 6.0 sq m
(d) 8.0 sq m

Answer : D

Question. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
(a) 500 m3
(b) 1000 m3
(c) 1500 m3
(d) 2000 m3

Answer : D

Question. As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
(a) 1.80 liters for 5 to 10 users
(b) 1.20 liters for 15 users
(c) 1.35 for 20 users
(d) All the above

Answer : D

Question. The 'centre line method' is specially adopted for estimating
(a) Circular buildings
(b) Hexagonal buildings
(c) Octagonal buildings
(d) All the above

Answer : D

Question. Pick up the correct statement from the following:
(a) In a gully trap, a water seal of 6 to 7.5 cm is provided
(b) The gully trap collects waste water from the kitchen, sink, wash basins, et(c)
(c) The gully trap disconnects the sullage drain from the main drainage system
(d) The grating provided over gully traps is 23 cm square

Answer : B

Question. Pick up the correct statement from the following:
(a) The bent up bars at a support resist the negative bending moment
(b) The bent up bars at a support resist the sharing force
(c) The bending of bars near supports is generally at 45°
(d) All the above

Answer : D

Question. According to Indian Standards Institute, the actual size of modular bricks is
(a) 23 cm × 11.5 cm × 7.5 cm
(b) 25 cm × 13 cm × 7.5 cm
(c) 19 cm × 9 cm × 9 cm
(d) 20 cm × 10 cm × 10 cm

Answer : C

Question. Pick up the correct statement from the following:
(a) Bricks are paid per thousand
(b) Cement is paid per 50 kg bag
(c) Lime is paid per quintal
(d) All the above

Answer : D

Question. The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
(a) 1.00 m3
(b) 1.25 m3
(c) 1.50 m3
(d) 1.75 m3

Answer : B

Question. The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
(a) 100 mm
(b) 150 mm
(c) 200 mm
(d) 175 mm

Answer : B

Question. The height of the sink of wash basin above floor level is kept
(a) 60 cm
(b) 70 cm
(c) 75 cm to 80 cm
(d) 80 cm

Answer : C

Question. Cost of fittings and their fixing is specified for the following sanitary fittings
(a) Water closets
(b) Flushing pipes
(c) Lavatory basins
(d) All the above

Answer : D

Question. The concrete work for the following part of the building of specified thickness is measured in square meters
(a) Root slabs
(b) Floors
(c) Wall panels
(d) All the above

Answer : D

Question. In the mid-section formula
(a) The mean depth is the average of depths of two consecutive sections
(b) The area of mid-sections is calculated by using mean depth
(c) The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
(d) All of the above

Answer : D

Question. Pick up the correct statement from the following:
(a) In order to check up the average depth of excavation, 'Dead man’s' are left at the mid-widths of borrow pits
(b) The earthwork calculation in excavation is made from the difference in levels obtained with a level
(c) The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
(d) All the above

Answer : D

Question. Pick up the correct statement from the following:
(a) The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
(b) The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
(c) The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
(d) All the above

Answer : D

Question. The brick work is not measured in cu m in case of
(a) One or more than one brick wall
(b) Brick work in arches
(c) Reinforced brick work
(d) Half brick wall

Answer : D

Question. The most reliable estimate is
(a) Detailed estimate
(b) Preliminary estimate
(c) Plinth area estimate
(d) Cube rate estimate

Answer : A

Question. The measurement is not made in square meters in case of
(a) (d)P.(c) (Damp proof course)
(b) Form works
(c) Concrete Jeffries
(d) R.(c) Chhajja

Answer : D

Question. Pick up the correct statement from the following:
(a) The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies
(b) Additional supervising staff engaged at work site, is called work charged establishment
(c) Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item
(d) All the above

Answer : D

Question. Pick up the correct statement in case of water supply.
(a) Pipes laid in trenches and pipes fixed to walls are measured separately
(b) Cutting through walls and floors are included with the item
(c) Pipes are classified according to their sizes and quality
(d) All the above

Answer : D

Question. The cross-sections for a highway is taken at
(a) Right angle to the centre line
(b) 30 meters apart
(c) Intermediate points having abrupt change in gradient
(d) All the above

Answer : D

Question. Pick up the incorrect statement from the following:
(a) The built up covered area at the floor level of any storey of a building is called plinth area
(b) The usable covered area of the rooms of any storey of a building is called carpet area
(c) The carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath room and glazed veranda, is called floor area
(d) None of these

Answer : D

Question. Berms are provided in canals if these are
(a) Fully in excavation
(b) Partly in excavation and partly in embankment
(c) Fully in embankment
(d) All the above

Answer : B

Question. The order of booking dimensions is
(a) Length, breadth, height
(b) Breadth, length, height
(c) Height, breadth, length
(d) None of these

Answer : A

Question. Carpet area does not include the area of
(a) The walls along with doors and other openings
(b) Bath room and lavatory
(c) Kitchen and pantry
(d) None of the above

Answer : D

Question. The slope of the outlet of 'P trap' below the horizontal is kept
(a) 8°
(b) 10°
(c) 12°
(d) 14°

Answer : D

Question. The rate of payment is made for 100 cu m (per % cu m) in case of
(a) Earth work in excavation
(b) Rock cutting
(c) Excavation in trenches for foundation
(d) All the above

Answer : D

Question. The measurement is made for stone work in square metre in case of
(a) Wall facing
(b) Columns, lintels, copings
(c) Building work
(d) (A) and (B) of the above

Answer : D

Question. The rate of an item of work depends on
(a) Specifications of works
(b) Specifications of materials
(c) Proportion of mortar
(d) All the above

Answer : D

Question. Pick up the correct statement from the following:
(a) Pointing is measured in sq.m
(b) Plastering is measured in sq.m
(c) Glazing is measured in sq.m
(d) All the above

Answer : D

Question. While estimating a reinforced cement structure, the omitted cover of concrete is assumed
(a) At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar
(b) In thin slabs, 12 mm minimum or diameter of the bar whichever is more
(c) For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more
(d) All the above

Answer : D

Question. Pick up the correct statement regarding the centre line method of estimating a building
(a) Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item
(b) The centre line is worked out separately for different sections of walls of a building
(c) The centre line length is reduced by half the layer of main wall joining the partition wall
(d) All the above

Answer : D

Civil Engineering MCQ Questions and Answers
Advanced Construction and Equipments MCQ Questions and Answers in Civil Engineering
Airport Engineering MCQ Questions and Answers in Civil Engineering
Applied Mechanics and Graphic Statics MCQ Questions and Answers in Civil Engineering
Basics of Civil Engineering MCQ Questions and Answers in Civil Engineering
Building Construction MCQ Questions and Answers in Civil Engineering
Building Maintenance MCQ Questions and Answers in Civil Engineering
Building Materials MCQ Questions and Answers in Civil Engineering
Building Services MCQ Questions and Answers in Civil Engineering
Building Technology and Architectural Planning MCQ Questions and Answers in Civil Engineering
Concrete Technology and Design of Concrete Structures MCQ Questions and Answers in Civil Engineering
Concrete Technology MCQ Questions and Answers in Civil Engineering
Construction Management MCQ Questions and Answers in Civil Engineering
Construction Technology MCQ Questions and Answers in Civil Engineering
Design of Masonry Structures MCQ Questions and Answers in Civil Engineering
Docks and Harbor Engineering MCQ Questions and Answers in Civil Engineering
Elements of Remote Sensing MCQ Questions and Answers in Civil Engineering
Engineering Economics MCQ Questions and Answers in Civil Engineering
Engineering Geology MCQ Questions and Answers in Civil Engineering
Engineering Graphics MCQ Questions and Answers in Civil Engineering
Engineering Mechanics MCQ Questions and Answers in Civil Engineering
Environmental Engineering MCQ Questions and Answers in Civil Engineering
Estimating and Costing MCQ Questions and Answers in Civil Engineering
Estimation Costing and Valuation Engineering MCQ Questions and Answers in Civil Engineering
Geotechnical Engineering MCQ Questions and Answers in Civil Engineering
Highway Engineering MCQ Questions and Answers in Civil Engineering
Hydraulic Machines MCQ Questions and Answers in Civil Engineering
Hydraulics and Fluid Mechanics MCQ Questions and Answers in Civil Engineering
Irrigation Engineering MCQ Questions and Answers in Civil Engineering
Maintenance and Rehabilitation of Structures MCQ Questions and Answers in Civil Engineering
Prefabricated Structures MCQ Questions and Answers in Civil Engineering
Principles of Management MCQ Questions and Answers in Civil Engineering
Problem Solving and Python Programming MCQ Questions and Answers in Civil Engineering
Professional Ethics in Engineering MCQ Questions and Answers in Civil Engineering
Public Health Engineering MCQ Questions and Answers in Civil Engineering
Railway Bridge and Tunnel Engineering MCQ Questions and Answers in Civil Engineering
Railway Engineering MCQ Questions and Answers in Civil Engineering
RCC Structures Design MCQ Questions and Answers in Civil Engineering
Reinforced Cement Concrete Structures MCQ Questions and Answers in Civil Engineering
Societal and Global Impact MCQ Questions and Answers in Civil Engineering
Soil Mechanics and Foundations MCQ Questions and Answers in Civil Engineering
Steel Structures Design MCQ Questions and Answers in Civil Engineering
Strength of Materials MCQ Questions and Answers in Civil Engineering
Structural Analysis MCQ Questions and Answers in Civil Engineering
Structural Design and Drawing MCQ Questions and Answers in Civil Engineering
Structural Mechanics MCQ Questions and Answers in Civil Engineering
Surveying MCQ Questions and Answers in Civil Engineering
Theory of Structures MCQ Questions and Answers in Civil Engineering
Tunnel Engineering MCQ Questions and Answers in Civil Engineering
Waste Water Engineering MCQ Questions and Answers in Civil Engineering
Waste Water Treatment MCQ Questions and Answers in Civil Engineering
Water Supply Engineering MCQ Questions and Answers in Civil Engineering

Civil Engineering Estimating and Costing MCQs

We hope students liked the above MCQs for Estimating and Costing designed as per the latest syllabus for Civil Engineering. Students should download the Multiple Choice Questions and Answers in Pdf format and practice the questions and solutions given above Civil Engineering MCQs Questions on daily basis. All latest MCQs with answers have been developed for Civil Engineering by referring to the most important and regularly asked topics which the students should learn and practice to get better score in tests and examinations.

MCQs for Civil Engineering Estimating and Costing

Expert teachers of studiestoday have referred to latest book for Civil Engineering to develop the Civil Engineering MCQs. If you download MCQs with answers for the above chapter daily, you will get higher and better marks in test and exams in the current year. Daily Multiple Choice Questions practice of Civil Engineering and its study material will help students to have stronger understanding of all concepts.

Estimating and Costing MCQs Civil Engineering

All MCQs given above for Civil Engineering have been made as per the latest syllabus and books issued for the current academic year. The students can refer to the answers which have been also provided by our teachers for all MCQs of Civil Engineering so that you are able to solve the questions and then compare your answers with the solutions provided by us. We have also provided lot of MCQ questions for Civil Engineering so that you can solve questions relating to all topics given in each chapter. All study material for Civil Engineering students have been given on studiestoday.

Civil Engineering MCQs for Estimating and Costing

Regular MCQs practice helps to gain more practice in solving questions to obtain a more comprehensive understanding of Estimating and Costing concepts. MCQs play an important role in developing understanding of Estimating and Costing. Students can download and save or print all the MCQs, printable assignments, practice sheets of the above chapter in Civil Engineering in Pdf format from studiestoday. After solving these you should also refer to Civil Engineering MCQ Test for the same chapter

MCQs Civil Engineering Estimating and Costing

Civil Engineering best textbooks have been used for writing the problems given in the above MCQs. If you have tests coming up then you should revise all concepts relating to Estimating and Costing and then take out print of the above MCQs and attempt all problems. We have also provided a lot of other MCQs for Civil Engineering which you can use to further make yourself better in Civil Engineering

Where can I download latest MCQs for Civil Engineering Estimating and Costing

You can download the MCQs for Civil Engineering Estimating and Costing for latest session from StudiesToday.com

Are the Civil Engineering Estimating and Costing MCQs available for the latest session

Yes, the MCQs issued for Civil Engineering Estimating and Costing have been made available here for latest academic session

Why are Estimating and Costing important for students?

Learning Estimating and Costing based MCQs will help students improve their overall understanding of important concepts and topics and help to score well in Civil Engineering exams.

How can I practice Estimating and Costing Questions?

You can practice Estimating and Costing through worksheets, textbooks and online quizzes provided by studiestoday.com.

Where can I find Civil Engineering Estimating and Costing MCQs online?

You can find Civil Engineering Estimating and Costing MCQs on educational websites like studiestoday.com, online tutoring platforms, and in sample question papers provided on this website.

How can I prepare for Estimating and Costing MCQs?

To prepare for Estimating and Costing MCQs, refer to the concepts links provided by our teachers and download sample papers for free.

Are there any online resources for Civil Engineering Estimating and Costing?

Yes, there are many online resources that we have provided on studiestoday.com available such as practice worksheets, question papers, and online tests for learning MCQs for Civil Engineering Estimating and Costing

Can I find Civil Engineering Estimating and Costing practice worksheets online?

Yes, you can find printable Estimating and Costing worksheets for Civil Engineering on studiestoday.com.

How can I get more free MCQs with answers for Civil Engineering Estimating and Costing MCQs?

We have provided full database of free multiple choice questions with answers on studiestoday.com for Civil Engineering Estimating and Costing