1. Concept of Quality Control depends on Quality Management Quality Assurance Quality Control All of the options 2. The process of comparing any dimension with its true value is known as ________ Accuracy Calibration Least count Precision 3. Which of the following is not included in the driving force of TQM? Import Survival Profitability Export Drive 4. Which of the following categories are included into ISO 14000 standards? Environmental Performance Evaluation Environmental Management System Environmental Auditing All of the options 5. Which of the following ISO 14001 aims are? Waste Prevention Pollution Control Energy Conservation All of the options 6. While compacting the concrete by a mechanical vibrator , the slump should not exceed 10 cm 2.5 cm 7.5 cm 5.0 cm 7. Which rating star is given by GRIHA for points between 71 - 80? 2 1 3 4 8. Who's suggested PDCA cycle? Juran Newton Shewhart Deming 9. Which of the following ISO standard series are used for environmental management? IS 14000 IS 9000 ISO 14000 ISO 9000 10. Improper curing results in Shrinkage cracks Increase in permeability Loss of strength All of the options 11. Indian equivalence of ISO 9000 is ___ ISO 14000 IS 14000 IS 14002 IS 14003 12. How many set of criteria formulated by GRIHA for rating the building? 33 32 31 34 13. When removal of form work for walls , columns and vertical faces of all structural members 8 to 12 hours 7 days 16 to 24 hours 2 to 3 days 14. Which of the following steps Juran gives for Quality Control. Act on the difference Compare actual performance to goals Evaluate actual operating performance All of the options 15. In which of the following factor does not affecting for quality control. Skill of workers does not Supervision standards Quality control plan None of the options 16. __________of a measurement denotes its closeness to another measurement of the same quality. Least count Precision Calibration Accuracy 17. Which of the following company may applied for ISO 9001 certificate? Fertilizers Building material Civil Structural All of the options 18. Which of the following ISO 14000 benefits are? Limit liability Improve cost control Protect human health All of the options 19. Which of the following activities are given quality assurance. Reliability Durability Safety All of the options 20. Which of the following elements should be used optimum to make a green building? Prithvi Jal Agni All of the options 21. __________denotes the Closeness of a measurement to its true value. Calibration Precision Accuracy Least count 22. Which of the following is not the purpose of a green building? To reduce use of water Re-use of waste materials To minimize damage of the environment None of the options 23. Removal of props under slabs spanning upto 4.5 m 21 days 7 days 14 days 3 days 24. Which of the following is not quality system document for getting the ISO 9000 certificate? Quality records Quality manual & Procedures Work instruction None of the options 25. LCA means that___ Life Cycle Assessment Life Cycle Association Life Council Assessment Local Cycle Assessment 26. Which of the following activities are not included in quality assurance? Durability Ductility Safety Reliability 27. For plastering new surfaces, all masonry joints should be raked to a depth of about ____ 12 mm 16 mm 15 mm 14 mm 28. Zaire proposed "Building blocks of TQM" in which year ? 1992 1990 1993 1991 29. When structure have a good quality it is ___ Workmanship should excellent Adequate testing Architecture planning proper All of the options 30. Which of the following cement does not have field test? When hand is inserted in cement bag it should give cool feeling. The colour of the cement should be greenish grey Final setting time of cement is 600 minutes There should not be any visible lumps 31. Proposed The house of TQM models in which year? 1993 1990 1992 1991 32. Which of following does not represented quality? Test results Strength Durability All of the options 33. First class bricks should not absorb more than ____% water 25.00% 20.00% 18.00% 15.00% 34. Which of the following is not an environment benefit for a green building? Decrease air quality Reduce solid waste To reduce use of water None of the options 35. What is the initial setting time & final setting time of cement? 45 minutes & 600 minutes 30 minutes & 600 minutes 30 minutes & 450 minutes 60 minutes & 300 minutes 36. For plastering proportion of mortar cement: sand shall be __________ 1:5 to 1:6 1:3 to 1:4 1:2 to 1:3 1:1 to 1:2 37. Which of the following is not a green building component? Design efficiency Water efficiency Material efficiency None of the options 38. Foundation, Pillars & the top three proposed in which TQM model? Organization Structure of TQM The house of TQM Building blocks of TQM Driving forces of TQM 39. What is say about friction between sample sizes to total item in a lot? Standard deviation Sampling fraction Variance None of the options 40. Which of the following assessments is made by LCA throughout the life of a building? Disposal of surplus waste material Transportation of construction material Use of building All of the options 41. Which of the following measures are not included in central tendency? Both. Range & Standard deviation and Mean, Median & Mode Mean, Median & Mode Range & Standard deviation None of the options 42. Which of the following techniques are for statistical process control. Check list Scatter diagram Pareto diagram All of the options 43. One or more items taken from a quantity is called___ Sample Lot size Sample size Lot 44. Largest frequency of the variable is called to___ Median Mean Mode None of the options 45. Which of the following phases is not a LCA process? Life cycle impact assessment Life cycle inventory Life cycle interpretation None of the options 46. C & E diagram is given by___. Dr. Ishikawa Dr. Joseph Juran Vilfredo Pareto Dr. Mark Crossby 47. Which of the following type of chart is to systematic way of recording data? C & E diagram Check list Scatter diagram Pareto diagram 48. Which of the following sampling techniques is useful when lot size is large and simple random sampling is not possible? Proportional sampling Stratified sampling Both Stratified sampling & Proportional sampling None of the options 49. Which of the following is not a sampling techniques? Two stage sampling Simple random sampling Three stage sampling None of the options 50. The method of preparation of a sample is called___ Inspection Sampling Testing None of the options Submit Answers Retake Test More Civil Engineering Study Material › Civil Engineering Mock Tests with AnswersAdvanced Construction and Equipments Mock TestAdvanced Construction Technology Mock TestBasics of Civil Engineering Mock TestBuilding Construction Mock TestBuilding Materials Mock TestBuilding Services Mock TestBuilding Technology and Architectural Planning Mock TestConcrete Technology and Design Mock TestConcrete Technology Mock TestConstruction Management Mock TestConstruction Project Management Mock TestConstruction Quality Control and Monitoring Mock TestConstruction Technology Mock Test Design of Masonry Structures Mock TestDesign of Reinforced Cement Concrete Elements Mock TestDesign of Steel Structures Mock TestDock and Harbour Engineering Mock TestElements of Remote Sensing Mock TestEngineering Geology Mock TestEngineering Graphics Mock TestEngineering Mechanics Mock TestEstimating and Costing Mock TestEstimation, Costing and Valuation Engineering Mock TestFluid Mechanics Mock TestFoundation engineering Mock Test Geotechnical Engineering Mock TestHighway Engineering Mock TestHydraulics and Fluid Mechanics Mock TestHydraulics Machines Mock TestHydraulics Mock TestIrrigation Engineering Mock TestMaintenance and Rehabilitation of Structures Mock TestPrefabricated Structures Mock TestProfessional Ethics in Engineering Mock TestPublic Health Engineering Mock TestRailway Bridge and Tunnel Engineering Mock TestRailway Engineering Mock Test Railways, Airports, Docks and Harbour Engineering Mock TestRCC Structures Design Mock TestSocietal and Global Impact Mock TestSoil Mechanics and Foundations Mock TestStructural Analysis Mock TestStructural Design and Drawing Mock TestStructural Design Mock TestStructural Mechanics Mock TestSurveying Mock TestWaste Water Treatment Mock TestWater Supply Engineering Mock TestWater and Wastewater Engineerin Mock Test Civil Engineering Mock TestsCivil Engineering MCQ Questions with Answers